Skip to content
Max Built Construction LLC
Pressure-treated wood deck with picket railing and stairs leading to a green suburban lawn

Deck cost planner

What does a new deck cost in Oswego or Aurora?

Use this rough planning tool to see how size, material, railing, stairs, and demolition move the number. It is not a quote — real pricing comes from an on-site visit.

Rough planning tool only. The ranges below are the sample planning figures Max Built works from — useful for comparing materials and sizes, but not a final price. Request an exact quote for pricing on your project.

Plan your deck

6–60 ft

6–60 ft

Decking material
40 linear ft

Suggested default covers three open sides of the deck.

Number of steps

Sample planning range

$12,500 – $20,500

Estimated 192 sq ft · Trex Enhance®

  • Decking, framing & labor$8,640 – $12,480
  • Railing (~40 ft)$2,400 – $5,600
  • Stairs (3 steps)$750 – $1,500
  • Material waste factor (5%)$590 – $979

Not a quote. These are sample planning figures; actual pricing from Max Built depends on framing, height, access, design, and permits.

Get an Exact Quote

Your selections carry over to the quote form.

What affects deck price

Ten factors that move the number.

Two decks with the same square footage can land far apart. Here's why.

  1. 01

    Size

    Square footage drives material and labor more than anything else.

  2. 02

    Decking material

    Pressure-treated wood is the lowest cost; Trex Transcend and PVC are premium.

  3. 03

    Framing condition

    Reusing a sound existing frame can save money; failing framing must be replaced.

  4. 04

    Deck height

    Elevated decks need taller posts, more bracing, and longer stairs.

  5. 05

    Stairs

    Each run of stairs adds stringers, treads, and railing.

  6. 06

    Railings

    Linear feet and system type (aluminum, composite, cable, glass) add up quickly.

  7. 07

    Demolition

    Removing and hauling away an old deck is a separate line item.

  8. 08

    Site access

    Tight side yards, fences, and slopes add labor time.

  9. 09

    Design complexity

    Angles, multiple levels, inlays, and picture-framing take more time and material.

  10. 10

    Permits & code

    Permit fees and code-required details vary by municipality.

Questions & answers

Deck cost questions

Want a real number?

An on-site visit is the only way to price your deck accurately. Request a quote and we'll take it from there.

Request a Quote